How to Handle Change Orders on a Painting Job
Quick answer: A change order is a written, priced, approved addition or alteration to the scope you originally agreed. Raise it immediately, before doing the…
Quick answer: A change order is a written, priced, approved addition or alteration to the scope you originally agreed. Raise it immediately, before doing the…
Quick answer: Underbidding is almost never a math mistake. It is a scope you did not see or did not write down, plus costs you…
Quick answer: Walk the job in a fixed order (outside first or room by room, never randomly), measure the surfaces that drive labor, photograph every…
Quick answer: Price by the hour internally, sell by the job externally. Hourly is the right way to cost a painting job, because hours are…
Quick answer: Estimate materials in two passes. First the coatings (paintable area divided by real spread rate, times coats, plus a waste allowance, with primer…
Quick answer: Price prep by tiering the surface condition (light, medium, or heavy) and applying that tier as a multiplier to your base production rate,…
Quick answer: Painting labor cost is paintable area divided by your production rate to get man hours, then man hours multiplied by your loaded labor…
Quick answer: Estimate paint for a whole house by measuring each room’s walls, ceilings and trim, dividing every surface by roughly 350 to 400 square…
Quick answer: A ceiling’s paintable area equals the room’s floor footprint, length times width. There are no windows or doors to subtract, so divide that…
Quick answer: Add up the linear feet of all your trim, multiply by the trim’s face width in feet to get square feet, then divide…